SSVE Project Portfolio
Mining Projects That Drive Progress
Our project portfolio reflects extensive experience in underground coal mining, drift drivage, incline development, blasting operations, conveyor maintenance, equipment deployment, and mine infrastructure development. Every project is executed with a focus on safety, productivity, and sustainable mining practices.
What Sets Our Projects Apart
- Safety-Driven Execution
- Skilled Technical Workforce
- Modern Mining Equipment
- Timely Project Delivery
- Government & Private Sector Experience
- Sustainable Mining Practices
Katkona RO UG Mine (SECL) – Drift Drivage & Construction of Strata Bunker
Katkona 1 & 2 Incline (SECL) – Heightening & widening of CM Panel & Marching route, material transport, cleaning & belt maintenance.
Shivpur Coal Block of Churcha RO Mine (SECL)– Drivage of 4 Nos stone drift by drilling & blasting & Belt maintenance.
Ghugra Block of Churcha RO Mine (SECL) – Drivage of 4 Nos stone drift by drilling & blasting & Belt.
Rani Atari UG Mine (SECL) – Assistance in maintenance of conveyor belt.
Damini UG Mine (SECL) – 12 Nos of drift drivage and face development work by D&B.
Naheriya UG Mine of Pench Area WCL.
Silewara colliery of WCL Nagpur Area – Operation and maintenance of Sand stowing.
Singhali UG Mine (SECL) – Open excavation with Drivage of Incline by blast free technology (Road header – O&M)
Kusmunda OCP (SECL) – Hiring of 06 No. 10 wheel truck chassis mounted mist blower fog cannon
HBM, RSA, OA- Underground work like assistance in mechanical maintenance of 05 LHDS and 03 UDMs, maintenance of belts including driveheads, maintenance of Pipe Lines including pumps and maintenance of manriding system at HBM, RSA, OA
Hirakhand Bundia Mine, RSA, OA, MCL – Underground supporting work.
SIAL Ghogri Coal Mine (RCCPL) – Coal Production by development by solid blasting Board & pillar method and depillaring with Caving operation along with Drift drivage work.
1. Bicharpur Coal Mine (UTCL) – Incline drivage & interconnection work.
2. Katkona 1 & 2 Incline (SECL) – Preparation of CM Marching route.
3. Katkona 1 & 2 Incline (SECL) – Drift drivage & Marching route preparation.
4. NCPH Colliery R-6 Mine (SECL) – Assistance in conveyor maintenance and route preparation work.